How to integrate Dropbox with Fireflies

This guide covers steps to integrate Dropbox with Fireflies.

What is Fireflies-Dropbox integration?

The Fireflies-Dropbox integration is a two-way integration that enables you to automatically send notes to your chosen Dropbox folders and transcribe existing audio files in Dropbox using our audio connector.

How to integrate Dropbox with Fireflies

Screenshot 2025-08-16 at 21.24.13.png
  • Search for Dropbox and click it

Screenshot 2025-08-16 at 21.25.43.pngScreenshot 2025-08-16 at 21.26.28.png
  • Click Connect

Screenshot 2025-08-16 at 21.27.09.png
  • Sign in to Dropbox

Screenshot 2025-08-16 at 21.28.57.pngScreenshot 2025-08-16 at 21.29.10.png
  • This will redirect you to your Dropbox account. Click Continue to authorize Fireflies to access the files and folders in Dropbox

Screenshot 2025-08-16 at 21.29.42.png
  • After you continue, you’ll be redirected back to the Fireflies integration page. Click + Configure

Screenshot 2025-08-16 at 21.29.58.png
  • Select an Action and click Continue

Screenshot 2025-08-16 at 21.30.09.png
  • Select a Destination folder and click Continue

Screenshot 2025-08-20 at 17.21.37.png
  • Select your Meeting Output Preferences and click Continue

Screenshot 2025-08-20 at 17.22.02.png
  • Click Save to complete your setup

Screenshot 2025-08-20 at 17.22.54.png
  • You'll see a pop message. This means your integration is now set up

Screenshot 2025-08-20 at 17.23.46.png

Push Past Meetings to Dropbox

Sometimes, the meetings you want in Dropbox happened before you connected the integration. Whether you enabled the integration later or simply want to add older meeting notes, Push Past Meetings lets you choose a date range and meeting type, then send those meetings to Dropbox in just a few clicks.

Note: Make sure you've connected Dropbox and created at least one push configuration before using Push Past Meetings. If you haven't, complete the Setting Up Your Configuration section above first.

Follow the steps below to push past meetings to Dropbox.

  1. From the Dropbox integration page, click Push past meetings.

    image.png
  2. A dialog box will appear. Choose the following:

  • Date range → Select the meetings you want to send by choosing Last 7, 14, 30, 60, or 90 days, or specify a custom date range.

    20260707_1404_58_5997431_V2.gif
  • Meetings to push → Choose whether to push Meetings I attended, Meetings I organized or joined, or All my meetings.

    image.png
  1. Click Push. Fireflies will send the matching meeting files to Dropbox using your existing configuration settings.

    image.png

Meetings recorded after you connect Dropbox are processed automatically. Push Past Meetings is only needed for meetings that happened before the integration was connected.